March 3, 2020 Meeting
20.01.17_Budget Set
A 2020-0303 Tucker presentation
Click here for a complete history of the project of the project.
THE TUCKER FREE LIBRARY: THE NEXT CHAPTER Information Session Video and Presentation Slides
At our public information session on Thursday, April 11th, the Trustees of the Tucker Free Library invited Henniker residents to meet with representatives of SMP Architecture to view the results of the recently concluded Architectural Feasibility Study.
VIEW FACEBOOK LIVE PRESENTATION HERE
VIEW SLIDE PRESENTATION & 3D MODEL HERE
Last March at Town Meeting, Henniker voters approved an appropriation for a feasibility study to determine how best to replace failing, obsolete handicap access lift (Garavanta) in the library. How best to provide a fully accessible building while providing handicapped accessible/ADA compliant public bathrooms. The study shall also include ideas on how to best address the potential use of the last open space in the library, the current unfinished attic on the top floor.
Henniker residents supported a $70,000.00 Warrant Article to continue to the next phase of the Library Building Accessibility and Safety Project. Phase 2: The Schematic Design was kicked off at the April 11th meeting. Jason Lacombe of SMP Architecture presented a conceptual program for the project.
SURVEYOR'S REPORT
TUCKER LIBRARY Boundary Plan (01-21-20)
TUCKER LIBRARY Topographic Plan (01-21-20)
GEOTECHNICAL SURVEY REPORT
Tucker Free Library – Henniker NH – Geotech Report
MECHANICAL ENGINEERING REPORT